IPC Paint
 
 

Become a "Featured Builder". Learn more about this unique program, only with IPC.

Learn more

 

  PAINTING

We start all our exterior re-painting, usually in May-June with an initial pressure cleaning, this is a mandatory step for all our repaints if you are to receive our four year guarantee. We then allow a dry time (usually one week), but will not start our painting until the moisture content falls below 15%, this will ensure a longer lasting problem free job.

We have done a In house study, competition vs IPC repaints over the last 13 years  All in all IPC's last and look better, twice as long due to a higher degree of preparation and product knowledge within the company. 

"We have repaints that are 10 years old and still look good now that is saving you money" .

Protection and Painting:

When the substrate is ready to paint we then prepare the building by covering all windows, fixtures, shrubs, and concrete etc. with tape, plastic, and drop sheets. We are very careful and ensure protectection of all surfaces. Any areas needing primer are then primed and depending on the system two or three coats of the coating are then applied according to the paint manufacturer and the MPDA/CPCA Master Painters and Decorators Association of British Columbia manual.

Upon finish, a quality control representative will inspect the work, recommend any areas requiring touch up to our painters, go through the job with you to ensure you have everything complete and to your satisfaction.

Campbell River Honda

Campbell River Honda  Strathcona Toyota  Salmon Point Pub  Residental Painting
   CR Honda         CR Toyota       Salmon Point     Custom Home

 

 

Interior Painting:

Our Interior painting is covered under our standard one year guarantee we properly re-drywall and repair all surfaces to receive a paint finish, with cleaning, proper primers, sanding before and between all coats to achieve the best and most durable finish possible. Upon completion a total cleaning, vacuuming  and removal of all rubbish is performed.

ALL our work is performed to MPDA of BC standards on every project.

Post Completion Exterior and Interior painting

We leave you with some paint for touch ups and mark all your products and paint codes onto a sticker and attach it along with an IPC contact sticker to your electrical panel for future reference.

We will mail or present you with a invoice within a few days of completion.
           
               Shell Station Willow Point

Interior Painting

      
Shell                  Marks WWW           Residential            Petro-Can Campbelton
Small Commercial Interior
          Large Commercial Interior        Residental interior               Petro Canada Interior

 

 

 

 


HOME
| ABOUT US | SERVICES | QUOTE | FAQ | LINKS | CONTACT

Copyright 2007 - IPC Paint and Renovation Contractors - All Rights Reserved